East SHABWAH - Blocks (10)
- Located in Masila- Say'un basin, with area of 964 Km2.
- Block(10) is operated by Total-French Company.
- The main reservoirs in the block are (Qishn Clastic), (Saar Sand, Saar Carbonate) in addition to (fracture basement rocks).
- The partners in the Production Sharing Agreement with the Yemeni government are:
KUFPEC (14.29%)
COMECO (28.57%)
TOTAL (28.57%)
OCCIDENTAL (28.57%).
- The block has (3) fields, with an average production rate of (40,000) BOPD.
- The total number wells ware 66 until Jan. 2007.
- The block is connected with the main pipeline of block 14 (NEXEN) by 46 Km long, and 10" diameter of the pipeline.
- The produced is intermediate oil in the different fields with a density between (28-32 API) for the main reservoirs, whereas is light oil in basement rocks with (41 API).